Customer Details*

Please enter your details below so that we can attach your selections to your file.

Must Cover...

Timing
  • We work back from your ideal delivery
  • For Nth NSW (above Canberra) and Sth QLD pools leave 1st week of the month
  • For Vic and Sth NSW (Canberra and below) 2nd and 4th week of the month
  • This schedule is to get to nearest depot only
  • Final delivery is organised by your assigned delivery driver

Have you gone through this?

Proposed date?
Payment Process
  • 25% Deposit
  • 50% at production stage (Approx 6 weeks from dispatch)
  • Final 25% prior to dispatch
  • Dispatch is not your final delivery
  • Final delivery to be organised and paid for directly
  • Pool only in production after the 50%
  • Pools will not be released prior to 100% paid

Have you gone through this?

Approvals and requirements
  • This is not in our area of expertise and is up to you
  • We do however have recommendations.

Have you gone through this?

Delivery
  • Delivery is to be paid to the providers directly
  • They follow the pricing and the inclusions/terms that are in your accepted quote
  • Do look at the terms as we provide what is required to get you up and running after your base preparation
  • For anything else such as crane, removal of fencing, ferries etc talk to them directly
  • You must have your base and pad ready for the shell and equipment

Have you gone through this?

Installation
  • Are you DIY install? Docs on the website
  • Install is to be paid to the providers directly
  • On the day the pool will need to be full to 200-300mm of water.
  • They follow the pricing and the inclusions/terms that are in your accepted quote
  • Do look at the terms as we provide what is required to get you up and running after your base preparation
  • For anything else such as light conduit, channels, painting, backfill etc talk to them directly
  • The pool must be filled within 24-48 hours after installation
  • There is a maintenance page once installed for you to take a look at

Have you gone through this?

Are you aware that the shell is required to be earth to be compliant? Heater is 15amp

Are you aware that the pool needs to be filled within 24-48 hrs and therefore will not be compliant?

Fill out below

Wall Colour Choice*

What colour of external wall would you like?

Liner Colour Choice*

What colour of internal liner would you like?

Bench / Step*

What side would you like the bench step? Pictured as if you were sitting on the bench looking into the pool.

Spa Jets*

How many spa jet set have you ordered?

Further comments or requests?